Project III - Final Requirements

Due Monday November 25:
Final Review


Minimum Requirements:
Be prepared to talk about how you have dealt with the existing site conditions.
• site model (with your massing studies inserted) at 1/16”=1’-0”
• site section at 1/16”=1’-0”
• relevant site analysis


Drawings must include context and the artwork drawn to scale, and the sections should
include scaled figures.
• plans at 1/8”=1’-0”
• sections at 1/8”=1’-0” (at least 2)
• model at 1/8”=1’-0” which includes site context
• paraline drawing (can be cut away or exploded) at 1/16” = 1’-0” or 1/8” = 1’-0” (with diagram overlays)
• 3 perspectives (with a view of each art piece)
• relevant diagrams


REMEMBER TO BRING
• printed images of the art (know name of artist and the artwork)
• art abstractions
• relevant process including study models, sketches (photocopied, scanned/printed, or trimmed originals)

No comments :

Post a Comment